On-stumps (raised) homes need a stump inspection before the frame goes on, then frame, lock-up, PCI, handover, and warranty. The stump stage is the key difference from slab-on-ground builds.

Illustration of on stumps construction
9,237
Inspections completed across Perth and Sydney
242,618
Defects found and catalogued in the DefectIndex
30,388
Defect types indexed in our published methodology
4.9★
175 Google reviews
12
Months free advice after every inspection
Same-day report

Same-day delivery subject to access and availability. See Terms.

12 months free advice

Phone and email access for questions about your report during ordinary business hours. See Terms.

Fully insured & qualified

Every inspector carries professional indemnity and public liability insurance.

Upfront price, before you book

The quote you see is what you pay. No hidden fees, ever.

Local franchise owners
Head office backing

The build sequence

Every stage in your on stumps build

Each inspection window closes when the next trade starts. Here is the full on stumps sequence: when each stage happens, when to book it, and what you lose if you miss it.

  1. Stage 1 of 6

    Stump Installation Inspection

    As soon as stumps or posts are installed

    When to book
    Book the moment stumps or posts are in. If there are footings, they need to be poured first.
    Why it matters
    Framing is built straight over them. Alignment and fixing faults disappear from view.
  2. Stage 2 of 6

    Frame Inspection

    Once all frame work is completed (wall and roof)

    When to book
    Book the day framing finishes, before any roof cover, cladding or plasterboard goes on.
    Why it matters
    Bracing, tie-downs and lintel sizing can only be checked now.
  3. Stage 3 of 6

    Lock Up Inspection

    When the house is sealed from the weather and can be locked

    When to book
    Book once the building is sealed and lockable: roof on, external doors and windows in, before internal fit-out begins.
    Why it matters
    Your last look at flashings, brick ties and waterproofing before the linings hide them.
  4. Stage 4 of 6

    Practical Completion Inspection

    Once the property is fit for occupation

    When to book
    Book as soon as your builder gives you the PCI date and time.
    Why it matters
    Defects documented at PCI are contract corrections. Miss them and they turn into warranty disputes.
  5. Stage 5 of 6

    Handover Inspection

    Once repairs are completed

    When to book
    Book once the builder confirms the PCI defect repairs are finished.
    Why it matters
    Independent confirmation that every PCI item was actually fixed before you accept the keys.
  6. Stage 6 of 6

    Warranty Inspection

    In the months after handover, before your warranty period closes

    When to book
    Book in good time before your warranty period closes. Your builder or contract sets the exact window.
    Why it matters
    The last window to put settling and movement defects back on the builder before the warranty closes.

Built to last. Inspected to be SURE.

One inspection, twelve months of advice, and the same person on the other end of the phone every time you call. That is the part you do not see on the brochure.

Same-day reports (subject to access and availability) 12 months free advice Your inspector reads every report