Construction · On Stumps
On Stumps Stage Inspections
On-stumps (raised) homes need a stump inspection before the frame goes on, then frame, lock-up, PCI, handover, and warranty. The stump stage is the key difference from slab-on-ground builds.
The build sequence
Every stage in your on stumps build
Each inspection window closes when the next trade starts. Here is the full on stumps sequence: when each stage happens, when to book it, and what you lose if you miss it.
-
- When to book
- Book the moment stumps or posts are in. If there are footings, they need to be poured first.
- Why it matters
- Framing is built straight over them. Alignment and fixing faults disappear from view.
-
- When to book
- Book the day framing finishes, before any roof cover, cladding or plasterboard goes on.
- Why it matters
- Bracing, tie-downs and lintel sizing can only be checked now.
-
- When to book
- Book once the building is sealed and lockable: roof on, external doors and windows in, before internal fit-out begins.
- Why it matters
- Your last look at flashings, brick ties and waterproofing before the linings hide them.
-
- When to book
- Book as soon as your builder gives you the PCI date and time.
- Why it matters
- Defects documented at PCI are contract corrections. Miss them and they turn into warranty disputes.
-
- When to book
- Book once the builder confirms the PCI defect repairs are finished.
- Why it matters
- Independent confirmation that every PCI item was actually fixed before you accept the keys.
-
- When to book
- Book in good time before your warranty period closes. Your builder or contract sets the exact window.
- Why it matters
- The last window to put settling and movement defects back on the builder before the warranty closes.