Stump Installation Inspection (On Stumps)
Stumps and posts verified against engineering drawings, dimensions, levels and installed services checked before the frame goes up.
- Same-day report (subject to access and availability)
- Upfront pricing
- 12 months free advice
What's in your stump installation inspection
Included
- Inspection of installed stumps or posts against engineering drawings
- Verification of dimensions and spacing to plans
- Level assessment across all installed stumps or posts
- Inspection of services laid around the stump/post installation
- Compliance assessment to AS 4349.0-2007
- Same-day written report with photo evidence
Not included
- Subfloor framing inspection (separate service at frame stage)
- Engineering certification
- Footing or foundation inspection (separate service)
Our inspectors document every accessible element on site with photo evidence and severity ratings.
Why you might need this
- Timber-framed homes on stumps where the installation needs to be verified before the floor frame is laid
- Decks or pergolas with post footings that need documented compliance
- Renovation or extension where new stumps or posts are installed
- Owner-builder wanting independent verification before proceeding to the frame stage
- Construction loan requiring a stage inspection at the stumps/posts milestone
Stage pricing is confirmed at booking. The fee depends on the build stage, site access, and inspection scope. Use the guide price in the header as a starting point, then book online to confirm your quote.
The build sequence
Where this inspection sits in the build
Every stage inspection has a right moment. Here is the full sequence, with this inspection highlighted and when to book each of the others.
Stage 1 of 6 This inspection
Stump Installation Inspection
As soon as stumps or posts are installed
- When to book
- Book the moment stumps or posts are in. If there are footings, they need to be poured first.
- Why it matters
- Framing is built straight over them. Alignment and fixing faults disappear from view.
View full 6-stage build sequence
-
Stage 1 of 6 This inspection
Stump Installation Inspection
As soon as stumps or posts are installed
- When to book
- Book the moment stumps or posts are in. If there are footings, they need to be poured first.
- Why it matters
- Framing is built straight over them. Alignment and fixing faults disappear from view.
-
- When to book
- Book the day framing finishes, before any roof cover, cladding or plasterboard goes on.
- Why it matters
- Bracing, tie-downs and lintel sizing can only be checked now.
-
- When to book
- Book once the building is sealed and lockable: roof on, external doors and windows in, before internal fit-out begins.
- Why it matters
- Your last look at flashings, brick ties and waterproofing before the linings hide them.
-
- When to book
- Book as soon as your builder gives you the PCI date and time.
- Why it matters
- Defects documented at PCI are contract corrections. Miss them and they turn into warranty disputes.
-
- When to book
- Book once the builder confirms the PCI defect repairs are finished.
- Why it matters
- Independent confirmation that every PCI item was actually fixed before you accept the keys.
-
- When to book
- Book in good time before your warranty period closes. Your builder or contract sets the exact window.
- Why it matters
- The last window to put settling and movement defects back on the builder before the warranty closes.
The process
- 1
Book after stump or post installation is complete
Schedule the inspection after all stumps or posts are installed but before the floor frame or deck framing begins.
- 2
Inspector verifies installation against plans
Your SURE inspector checks dimensions, spacing, levels, and services against approved engineering drawings.
- 3
Same-day report delivered
A detailed report with photos and any defects noted is delivered the same day.
- 4
12 months free advice
Questions about findings can be directed to your inspector during the 12-month free advice period.
See exactly what you get before you book
Our stump installation inspection (on stumps) report includes annotated photos, severity ratings, AS 4349 references and actionable remediation advice. Written in plain language so you can act on it the day you receive it.
- Photo evidence per finding
- Severity rated: critical, moderate, cosmetic
- Australian Standards cross-referenced
- Remediation guidance you can quote
What our stump installation inspections commonly find
Our DefectIndex documents inspection findings across Perth and Sydney. Browse the defect categories most relevant to this type of inspection.
About a stump installation inspection
The Stump & Post Installation Inspection verifies the installation of foundation stumps or posts against approved engineering drawings, completed in accordance with AS 4349.0-2007 (Inspection of Buildings, General Requirements). The inspector checks dimensions, spacing, levels, and installed services to ensure compliance before the floor frame or decking is laid.
This inspection is particularly relevant for timber-framed homes on stumps, elevated decks, and extensions where post footings are used. Identifying non-compliances before the frame is erected allows corrections at minimum cost. Adjustments to height, spacing, or position are straightforward at this stage and costly once the floor frame is bearing on them.
You might also need
Before you book
When is this inspection relevant?
This inspection is used when a property uses stump or post foundations rather than a concrete slab, common in older or elevated homes, and for decks, pergolas, and extensions. It verifies the installation meets the engineering specification before the floor frame is erected.
Is this inspection required by council or the bank?
Requirements vary by lender, council, and building contract. Some construction loans require stage inspections at every milestone including stumps. An independent inspection report documents completion of the stage.
Can I combine this with other construction stage inspections?
Each construction stage inspection is booked separately, as they occur at different points in the build timeline. Your inspector can advise on the right sequence for your project.
Does this cover the subfloor framing?
No, subfloor framing is assessed at the frame stage inspection, not the stump/post inspection.