Downpipes In Progress

Drainage/real

Downpipes In Progress is a moderate-severity drainage defect SURE inspectors have documented across 3 inspection reports.

Causes

  • Stage of construction not yet finalized
  • Construction phase not finalized
  • Ongoing construction schedule

Symptoms to look for

  • Erosion or moisture issues near the building perimeter during rainfall
  • Inadequate or incomplete rainwater drainage from the roof
  • Downpipes partially installed or missing
  • Visible indications of ongoing work
  • Water pooling around the foundation

Remedies

  • Ensure all downpipes are fully installed and connected to the stormwater system as per design plans
  • Complete the installation of all downpipes according to plans
  • A re-inspection is recommended upon completion
  • Conduct a re-inspection once work is finished
Moderate

Worth asking our inspector about this specifically.

This is common across Perth stock and usually fixable without drama, but the scope of the fix varies. Every SURE inspection includes 12 months of free advice. Call out the defect by name and we check for it directly.

Inspector-written

Curated entries in Drainage

All entries →
  • Curated 1–4/5
    Undrained Air Conditioner Overflow

    Split-system and ducted air conditioners produce condensate that must be piped away from the building. Where the overflow line terminates against the wall or discharges onto soil at the perimeter, repeated wetting creates conducive conditions for subfloor moisture, termite activity, and rising damp in adjacent masonry or framing.

  • Curated 1–4/5
    Inadequate Surface Water Drainage

    Where surface water cannot drain freely away from the building perimeter, it accumulates against footings and walls, creating persistent soil moisture that is a primary conducive condition for termite activity and footing movement. The BCA requires finished ground levels to fall away from the building at a minimum 1:100 grade for at least 1 metre at every external wall.

  • Curated 1–4/5
    Downpipes Not Connected to Storm Water

    One or more downpipes discharge directly onto the ground at the building perimeter rather than into a stormwater system. Water concentrates against footings, raising the risk of footing movement, rising damp, and termite conducive conditions - we find this in 22.1% of all Perth inspection reports.

  • Curated 1–3/5
    Debris in Gutters

    Leaf litter, dirt, and organic matter accumulating in gutters blocks downpipes and causes water to back up, overflow, and saturate fascia and eave linings. We see this in 17.5% of all Perth inspection reports - one of the most frequent maintenance defects on the books.

  • Curated 1–3/5
    Uneven Pathways

    Differential settlement of concrete or paved pathways creates raised or sunken sections that direct surface water toward the building rather than away from it. Our inspectors record this in 7.86% of all Perth reports. Beyond water ponding and potential moisture ingress at the perimeter, uneven surfaces present a trip-hazard that may engage liability considerations for vendors and landlords.

  • Curated 2–4/5
    Stormwater Drainage Directed Towards Building

    Site grading or paving directing stormwater runoff towards the building foundation rather than away from it. Causes subfloor moisture accumulation, rising damp, and potential foundation movement on reactive soils.

Same category

More from Drainage

All entries →
9,237 inspections
242,618 defects found
30,388 defect types
Local franchise owners
Head office backing

Built to last. Inspected to be SURE.

One inspection, twelve months of advice, and the same person on the other end of the phone every time you call. That is the part you do not see on the brochure.

Same-day reports (subject to access and availability) 12 months free advice Your inspector reads every report
Start my quote
Or call 1300 787 327 business hours support

9,237 inspections · 242,618 defects found · Inspector-owned franchises