Non-compliant Balcony Step Down and Drainage System
Non-compliant Balcony Step Down and Drainage System is a cosmetic drainage defect SURE inspectors have documented across 1 inspection report.
Causes
- Construction not adhering to Australian Standards for balcony design and drainage
- Inadequate implementation of alternative drainage solution
Symptoms to look for
- Incorrect linear drain placement along door line
- Insufficient 1:100mm fall away from dwelling
- Missing water stop angles under door frame
- Absence of minimum 75mm step-down
Remedies
- Implement a compliant alternative solution with linear drain directly along the door line, water stop angles under the door frame, and a 1:100mm fall away from the dwelling
- Reconstruct balconies to include a minimum 75mm step-down
Include this check in your next inspection.
Typically a low-severity finding, but worth documenting before maintenance work. Every SURE inspection includes 12 months of free advice.
Curated entries in Drainage
- Curated 1–4/5Undrained Air Conditioner Overflow
Split-system and ducted air conditioners produce condensate that must be piped away from the building. Where the overflow line terminates against the wall or discharges onto soil at the perimeter, repeated wetting creates conducive conditions for subfloor moisture, termite activity, and rising damp in adjacent masonry or framing.
- Curated 1–4/5Inadequate Surface Water Drainage
Where surface water cannot drain freely away from the building perimeter, it accumulates against footings and walls, creating persistent soil moisture that is a primary conducive condition for termite activity and footing movement. The BCA requires finished ground levels to fall away from the building at a minimum 1:100 grade for at least 1 metre at every external wall.
- Curated 1–4/5Downpipes Not Connected to Storm Water
One or more downpipes discharge directly onto the ground at the building perimeter rather than into a stormwater system. Water concentrates against footings, raising the risk of footing movement, rising damp, and termite conducive conditions - we find this in 22.1% of all Perth inspection reports.
- Curated 1–3/5Debris in Gutters
Leaf litter, dirt, and organic matter accumulating in gutters blocks downpipes and causes water to back up, overflow, and saturate fascia and eave linings. We see this in 17.5% of all Perth inspection reports - one of the most frequent maintenance defects on the books.
- Curated 1–3/5Uneven Pathways
Differential settlement of concrete or paved pathways creates raised or sunken sections that direct surface water toward the building rather than away from it. Our inspectors record this in 7.86% of all Perth reports. Beyond water ponding and potential moisture ingress at the perimeter, uneven surfaces present a trip-hazard that may engage liability considerations for vendors and landlords.
- Curated 2–4/5Stormwater Drainage Directed Towards Building
Site grading or paving directing stormwater runoff towards the building foundation rather than away from it. Causes subfloor moisture accumulation, rising damp, and potential foundation movement on reactive soils.