Skip to content
Construction

Handover Inspection

From $300 inc GST

Independent verification that PCI defects have been addressed before you accept the property, documented close-out of all outstanding items.

  • Same-day report (subject to access and availability)
  • Upfront pricing
  • 12 months free advice
Common defect example from a handover inspection
Scope

What's in your handover inspection

Included

  • Verification of all defects identified in the Practical Completion Inspection
  • Verification of all outstanding or unfinished work
  • Assessment of suitability for occupancy
  • Any new defects identified since the PCI
  • Compliance assessment to AS 4349.0-2007
  • Same-day written report with photo evidence

Not included

  • Full fresh PCI scope (this inspection verifies the PCI list, not a new full inspection)
  • Structural assessment
  • Timber pest inspection
Australian Standards
AS 4349.0-2007
Handover Inspection on site

Our inspectors document every accessible element on site with photo evidence and severity ratings.

When to use this inspection

Why you might need this

  • Builder has completed PCI defect rectification and is requesting final payment
  • Remotely located investor or property manager ensuring the property is genuinely ready
  • You attended the PCI but want documented confirmation that all items have been fixed
  • Multiple trades were involved in rectification and you want independent verification
  • Your building contract conditions require documented defect close-out before final payment
Pricing

Stage pricing is confirmed at booking. The fee depends on the build stage, site access, and inspection scope. Use the guide price in the header as a starting point, then book online to confirm your quote.

The build sequence

Where this inspection sits in the build

Every stage inspection has a right moment. Here is the full sequence, with this inspection highlighted and when to book each of the others.

  1. Stage 1 of 11

    Pre-Pour

    1-2 days before concrete is poured

    When to book
    Book as soon as your builder confirms the pour date. We inspect one to two days before the trucks arrive.
    Why it matters
    Once concrete is poured, the formwork, footings and reinforcement can never be checked again.
  2. Stage 2 of 11

    Concrete Pour Witness

    On the day of the pour

    When to book
    Book once the pour date is locked in. One visit covers the pre-pour check and the pour itself.
    Why it matters
    The one chance to check the slab while it is being placed, not after it has set.
  3. Stage 3 of 11

    Concrete Slab

    2+ days after the concrete is poured and set

    When to book
    Book for two or more days after the pour, before your builder starts framing or brickwork.
    Why it matters
    Once the walls go up, nobody can check the slab set-out or catch early cracking.
  4. Stage 4 of 11

    Stump / Post

    As soon as stumps or posts are installed

    When to book
    Book the moment stumps or posts are in. If there are footings, they need to be poured first.
    Why it matters
    Framing is built straight over them. Alignment and fixing faults disappear from view.
  5. Stage 5 of 11

    Plate High

    Once the brick walls are completed

    When to book
    Book when the brick walls top out, before the roof trusses arrive on site.
    Why it matters
    Wall plumbness, plate level and tie-downs are out of reach once the roof frame goes on.
  6. Stage 6 of 11

    Frame

    Once all frame work is completed (wall and roof)

    When to book
    Book the day framing finishes, before any roof cover, cladding or plasterboard goes on.
    Why it matters
    Bracing, tie-downs and lintel sizing can only be checked now.
  7. Stage 7 of 11

    Roof Frame

    Once the frame has been completed

    When to book
    Book once the roof frame is up, before the roof cover goes on.
    Why it matters
    Truss fixing and roof bracing get sealed under the roof cover for the life of the house.
  8. Stage 8 of 11

    Lock Up

    When the house is sealed from the weather and can be locked

    When to book
    Book once the building is sealed and lockable: roof on, external doors and windows in, before internal fit-out begins.
    Why it matters
    Your last look at flashings, brick ties and waterproofing before the linings hide them.
  9. Stage 9 of 11

    PCI

    Once the property is fit for occupation

    When to book
    Book as soon as your builder gives you the PCI date and time.
    Why it matters
    Defects documented at PCI are contract corrections. Miss them and they turn into warranty disputes.
  10. Stage 10 of 11 This inspection

    Handover

    Once repairs are completed

    When to book
    Book once the builder confirms the PCI defect repairs are finished.
    Why it matters
    Independent confirmation that every PCI item was actually fixed before you accept the keys.
  11. Stage 11 of 11

    Warranty

    In the months after handover, before your warranty period closes

    When to book
    Book in good time before your warranty period closes. Your builder or contract sets the exact window.
    Why it matters
    The last window to put settling and movement defects back on the builder before the warranty closes.
How it works

The process

  1. 1

    Provide the PCI report

    Share your Practical Completion Inspection report with the inspector at booking so they can verify each listed item.

  2. 2

    Inspector verifies all PCI items

    Your SURE inspector works through each defect from the PCI report to confirm rectification. Any new defects found since the PCI are also documented.

  3. 3

    Same-day report delivered

    A handover report confirming which items have been rectified, which remain outstanding, and any new findings is delivered the same day.

  4. 4

    Proceed to handover with confidence

    Use the report to support final settlement, or raise outstanding items with your builder before signing off. Your inspector is available for follow-up during the 12-month free advice period.

Sample report

See exactly what you get before you book

Our handover inspection report includes annotated photos, severity ratings, AS 4349 references and actionable remediation advice. Written in plain language so you can act on it the day you receive it.

  • Photo evidence per finding
  • Severity rated: critical, moderate, cosmetic
  • Australian Standards cross-referenced
  • Remediation guidance you can quote
First page of a real SURE handover inspection report
Real inspection
The detail

About a handover inspection

The Handover Inspection verifies that all defects identified during the Practical Completion Inspection have been rectified before the final payment is made, in accordance with AS 4349.0-2007.

The inspector works through the PCI defect list item by item, documenting which items have been rectified, which remain outstanding, and any new defects that have appeared since the PCI. It is useful for investors or property managers located elsewhere who need documented confirmation before settlement.

Same-day report delivery and 12 months of free advice are standard.

Why this inspection matters

Before accepting the property, independent verification confirms every listed defect has been properly addressed. The Handover Inspection gives you documented confirmation. If items remain outstanding, the report gives you a clear record to raise with your builder before signing off.

Your building contract sets out what must be complete before settlement occurs. A handover inspection before final payment costs a fraction of what post-settlement defect claims typically involve in time and expense.

Common questions

About handover inspection

Do I need the PCI report to book a handover inspection?

Providing the PCI report is strongly recommended, it allows the inspector to verify each listed item systematically. If no PCI was conducted, the handover inspection can still proceed but will be broader in scope.

What if some PCI defects have not been fixed?

The report will clearly identify outstanding items. This gives you documented grounds to withhold final payment or the relevant portion of it under your building contract.

Is this inspection the same as the PCI?

No, the Handover Inspection is a follow-up to the PCI, verifying that defects have been rectified. It is shorter and more targeted than the full PCI scope.

Is this inspection useful for investors who couldn't attend the PCI?

Yes, the Handover Inspection is specifically designed for remotely located investors and property managers who need independent verification that the property is ready for occupancy and tenants.

When should the handover inspection be booked?

Book the handover inspection after your builder notifies you that all PCI defects have been rectified, and before you make your final payment or sign any documents accepting the property.