Skip to content
Construction

Frame Inspection (Brick Veneer / Timber Frame)

From $540 inc GST

Wall and roof frame verified before the roof cover is installed, flashings, bracing, anchors, window frames and wall ties all checked.

  • Same-day report (subject to access and availability)
  • Upfront pricing
  • 12 months free advice
Common defect example from a frame inspection (brick veneer / timber frame)
Scope

What's in your frame inspection (brick veneer / timber frame)

Included

  • Wall frame and roof frame compliance to AS 1684.2-2021
  • Flashings, installation and integration with openings
  • Levels, wall frame plumb and straightness
  • Dimensions to approved plans
  • Mortar joins and door/window frames
  • Wall ties, spacing, installation, embedment
  • Bracing, type, spacing, fixing
  • Anchors and mechanical fasteners
  • Slab cracking at wall base
  • Quality of work assessment
  • Same-day written report with photo evidence

Not included

  • Brickwork veneer skin (assessed at lock-up stage)
  • Roof cover installation
  • Plasterboard or internal fit-out
  • Engineering certification
Australian Standards
AS 1684.2-2021 AS 4349.0-2007
Frame Inspection (Brick Veneer / Timber Frame) on site

Our inspectors document every accessible element on site with photo evidence and severity ratings.

When to use this inspection

Why you might need this

  • Brick veneer or timber frame home approaching the point where the roof cover will be installed
  • Builder's client wanting independent frame compliance verification
  • Owner-builder requiring documented frame inspection before the roof is installed
  • Construction loan requiring a frame stage inspection
  • Dispute prevention, documented frame condition before subsequent stages begin
Pricing

Stage pricing is confirmed at booking. The fee depends on the build stage, site access, and inspection scope. Use the guide price in the header as a starting point, then book online to confirm your quote.

The build sequence

Where this inspection sits in the build

Every stage inspection has a right moment. Here is the full sequence, with this inspection highlighted and when to book each of the others.

  1. Stage 1 of 11

    Pre-Pour

    1-2 days before concrete is poured

    When to book
    Book as soon as your builder confirms the pour date. We inspect one to two days before the trucks arrive.
    Why it matters
    Once concrete is poured, the formwork, footings and reinforcement can never be checked again.
  2. Stage 2 of 11

    Concrete Pour Witness

    On the day of the pour

    When to book
    Book once the pour date is locked in. One visit covers the pre-pour check and the pour itself.
    Why it matters
    The one chance to check the slab while it is being placed, not after it has set.
  3. Stage 3 of 11

    Concrete Slab

    2+ days after the concrete is poured and set

    When to book
    Book for two or more days after the pour, before your builder starts framing or brickwork.
    Why it matters
    Once the walls go up, nobody can check the slab set-out or catch early cracking.
  4. Stage 4 of 11

    Stump / Post

    As soon as stumps or posts are installed

    When to book
    Book the moment stumps or posts are in. If there are footings, they need to be poured first.
    Why it matters
    Framing is built straight over them. Alignment and fixing faults disappear from view.
  5. Stage 5 of 11

    Plate High

    Once the brick walls are completed

    When to book
    Book when the brick walls top out, before the roof trusses arrive on site.
    Why it matters
    Wall plumbness, plate level and tie-downs are out of reach once the roof frame goes on.
  6. Stage 6 of 11 This inspection

    Frame

    Once all frame work is completed (wall and roof)

    When to book
    Book the day framing finishes, before any roof cover, cladding or plasterboard goes on.
    Why it matters
    Bracing, tie-downs and lintel sizing can only be checked now.
  7. Stage 7 of 11

    Roof Frame

    Once the frame has been completed

    When to book
    Book once the roof frame is up, before the roof cover goes on.
    Why it matters
    Truss fixing and roof bracing get sealed under the roof cover for the life of the house.
  8. Stage 8 of 11

    Lock Up

    When the house is sealed from the weather and can be locked

    When to book
    Book once the building is sealed and lockable: roof on, external doors and windows in, before internal fit-out begins.
    Why it matters
    Your last look at flashings, brick ties and waterproofing before the linings hide them.
  9. Stage 9 of 11

    PCI

    Once the property is fit for occupation

    When to book
    Book as soon as your builder gives you the PCI date and time.
    Why it matters
    Defects documented at PCI are contract corrections. Miss them and they turn into warranty disputes.
  10. Stage 10 of 11

    Handover

    Once repairs are completed

    When to book
    Book once the builder confirms the PCI defect repairs are finished.
    Why it matters
    Independent confirmation that every PCI item was actually fixed before you accept the keys.
  11. Stage 11 of 11

    Warranty

    In the months after handover, before your warranty period closes

    When to book
    Book in good time before your warranty period closes. Your builder or contract sets the exact window.
    Why it matters
    The last window to put settling and movement defects back on the builder before the warranty closes.
How it works

The process

  1. 1

    Book after frame is complete, before roof cover

    The inspection must occur after the wall and roof frame are erected but before any roof cover or external cladding is installed.

  2. 2

    Inspector assesses all framing elements

    Your SURE inspector checks wall frame and roof frame compliance against AS 1684.2 and the approved plans, wall ties, bracing, flashings, anchors, and dimensional accuracy.

  3. 3

    Same-day report delivered

    A detailed report with photos, defect locations, and rectification requirements is delivered the same day.

  4. 4

    12 months free advice

    Your inspector is available for questions about findings during the free advice period.

Sample report

See exactly what you get before you book

Our frame inspection (brick veneer / timber frame) report includes annotated photos, severity ratings, AS 4349 references and actionable remediation advice. Written in plain language so you can act on it the day you receive it.

  • Photo evidence per finding
  • Severity rated: critical, moderate, cosmetic
  • Australian Standards cross-referenced
  • Remediation guidance you can quote
First page of a real SURE frame inspection (brick veneer / timber frame) report
Real inspection
The detail

About a frame inspection (brick veneer / timber frame)

The Frame Inspection is completed to verify compliance of the installed wall and roof frame in brick veneer or timber frame construction, in accordance with AS 1684.2-2021.

This inspection is the frame-stage equivalent for brick veneer and timber frame construction. Both the Frame Inspection and the Plate High Inspection cover the same point in the build sequence (walls and frame complete, before the roof cover is installed) but apply to different construction types. Frame Inspection is for brick veneer and timber frame builds; Plate High is for double brick (cavity brick) builds.

This inspection is for brick veneer and timber frame construction. For double brick (cavity brick) construction, book the Plate High Inspection instead. The inspection must be completed before the roof cover is installed to allow all frame elements to be verified against approved plans.

When to book

Book after the wall and roof frame are erected, before the roof cover or external cladding is installed.

  • Bracing, anchors, and mechanical fasteners are fully visible at this stage
  • Member sizes and spans can be checked against approved plans before cladding covers them
  • Frame defects can be rectified without removing roofing or cladding
  • Once the roof cover goes on, getting back to the frame means demolition

This covers wall frame plumb and straightness, roof frame compliance, wall ties, bracing, mechanical fasteners, flashings, anchors, and dimensional accuracy, providing comprehensive documentation of frame quality before it is concealed by roofing and cladding.

Why this inspection matters

The window to inspect a timber frame is narrow: after the frame is erected but before the roof cover is installed. Once roofing and cladding are on, the entire structural frame is concealed. Bracing omissions, incorrect anchor bolt placement, and non-compliant member sizing cannot be identified without removing finished materials. This is the only point in the construction sequence where all framing elements are visible.

AS 1684.2 sets specific requirements for bracing type and spacing, anchor fixing patterns, wall tie embedment, and member sizing. These are not design-stage requirements that the builder “should have” followed. They are code compliance items the inspector verifies against the approved plans and the standard. Wall ties at incorrect spacing, bracing panels in the wrong locations, and anchor bolts with insufficient edge distance are among the most common findings. Each of these affects structural performance under wind loading and cannot be addressed after the roof cover is laid without demolition.

Common questions

About frame inspection (brick veneer / timber frame)

What is the difference between this and the double brick roof frame inspection?

The Frame Inspection (BV/Timber) covers both the wall frame and roof frame in brick veneer and timber frame construction. This is a combined wall and roof frame check. The double brick roof frame inspection covers only the roof frame, as the brickwork is assessed at the separate plate high stage.

Does this cover engineered timber (LVL, etc.)?

Yes, the inspection covers all frame construction materials including conventional timber, engineered timber (LVL), and prefabricated components. Member sizes and spans are checked against the approved design.

When should I book this inspection?

After the wall and roof frame are completely erected but before the roof cover is installed or external cladding is applied. This is the only point at which all framing elements are accessible.

What if the inspector finds defects?

The report documents each defect with photos and location. Your builder is responsible for rectification. SURE inspectors are available during the free advice period to answer questions about required remediation.

Is this inspection required by the building permit?

The statutory Building Surveyor inspection is a separate requirement. An independent SURE inspection is an additional quality assurance measure, not a replacement for mandatory statutory inspections.