Slab edge: limit on what could be checked
Inspectors recorded the slab edge as a limit on what the inspector could check. The report names the part, with no separate failure noted.
Limit on what could be checked252 reports, in 146 suburbs.
What this means for you
The inspector could not see or reach this part.
How it compares
Number 5 of 5 on this part, by reports.
Where inspectors have recorded it
Recorded in 146 suburbs. 6 have enough reports to name.
- Ellenbrook16 reports
- Aveley6 reports
- Baldivis6 reports
- Cannington6 reports
- Armadale5 reports
- Stirling5 reports
What to do
- Ask for access to be arranged before you decide.
- Book a follow-up check of the part that could not be seen.
- Ask your inspector to check it by name.
Seen this in a report?
An experienced inspector can check it on site and tell you what it means for the property.
12 months free advice after every inspection.