Skip to content
SURE Building Inspections
Your local Central Coast inspector · NSW Central Coast

Build Your Dream Home with Total Confidence

99% Same-Day Reports Subject to access and availability.

Have complete peace of mind at every stage of construction. Our expert new-build inspections help you catch issues early, ensure quality workmanship, and walk into a defect-free home on handover day.

Independent Stage & Handover 12 Months FREE Expert Advice

from $640 12 months free advice

4.9★ from 277 Google reviews across Australia · 242,618 Defects Logged across the SURE network

What are you doing?, step 1 of 5

Step 1 of 5 · What are you doing?

What are you doing?

This decides which inspection actually helps you.

Loading the form. You can also call us using the number below.

What are you doing?

137 suburbs covered in Central Coast

137 suburbs covered 12 mo free advice included Local franchise owner

What makes SURE different

9,237 inspections
242,618 Defects Logged
Local territory zones
Head office backing
Anthony Capasso, Inspector for SURE Building Inspections Central Coast
Anthony Capasso Inspector · Central Coast

Anthony Capasso

Inspector

Anthony is the owner and lead inspector for SURE Building Inspections on the Central Coast of NSW. He spent more than 20 years on the tools as a self-employed carpenter, running residential jobs, coordinating trades and holding workmanship to standard. He has managed teams of tradespeople and apprentices, trained and mentored them, and kept safe work practices front of mind on every site. He has built the things he now inspects, so he knows how a house goes together and where the shortcuts get taken. His reports say what he found in language the client can act on.

4.9

277 Google reviews

Across Australia

Read reviews

We provide building inspections in various local areas

We cover the Central Coast and other regions across our network, including:

We also inspect across Greater Sydney — Parramatta, the Hills, Penrith and Macarthur.

Suburbs we cover in the Central Coast region

137 suburbs across the Central Coast region. Jump to a letter, or browse all.

Browse all 137 suburbs by letter Alphabetical, A–Z

A 2 suburbs

B 14 suburbs

C 8 suburbs

D 6 suburbs

E 6 suburbs

F 4 suburbs

G 6 suburbs

H 6 suburbs

J 1 suburb

K 11 suburbs

L 7 suburbs

M 9 suburbs

N 6 suburbs

O 1 suburb

P 10 suburbs

R 1 suburb

S 8 suburbs

T 11 suburbs

U 1 suburb

W 18 suburbs

Y 1 suburb

Why choose SURE Building Inspections on the Central Coast

Coastal-stock expertise

From older fibro and timber homes around Woy Woy and Long Jetty to waterfront properties at Terrigal, we know how salt air, damp and the local climate show up in Central Coast housing stock.

New-build stage inspections

Building in the Warnervale and Hamlyn Terrace growth corridor? We inspect at frame, lock-up and practical completion so defects are caught before the builder closes them up.

Plain-English reports

Your Central Coast report is photographed, clearly written and focused on accessible defects, safety items and maintenance risks so you can decide what needs attention before you commit.

12 months of free advice

Call us any time within twelve months with questions about your report. We'll help you understand what needs attention now and what can wait.

Upfront pricing

Your new build practical completion inspection, priced upfront.

All prices are from-prices; the exact figure depends on your property.

Use the pricing calculator for an exact quote

What a new build practical completion inspection in the Central Coast region covers

Included

  • Driveway, paths and steps
  • Fences, retaining walls and surface drainage
  • Landscaping and letterbox
  • Pergolas, decking and sheds
  • Doors and windows, operation, hardware, seals
  • Facia, barge boards and eaves
  • Roof cover, gutters and downpipes
  • Roof cavity, accessible areas inspected from the manhole
  • Plumbing drains, taps and toilets
  • Cabinets, vanities, mirrors, shower screens and baths
  • Kitchen appliances, tested where power is connected and appliances are accessible
  • Appliances, lights and air-conditioning, tested
  • Vents, skylights, insulation and sarking
  • Wall and ceiling paint, defects and quality
  • Polarity testing to all power points
  • Termite treatment verification
  • Same-day written report with photo evidence

Not included

  • Structural assessment of the building
  • Timber pest inspection
  • Engineering certification
  • Areas not accessible or not yet completed by the builder

When you need this inspection

  • Builder has called 'practical completion' and is requesting handover, you need an independent assessment first
  • First time building a new home and want expert eyes before signing off
  • Remotely located investor who cannot attend handover in person
  • Building contract gives you one opportunity to reject defects before you accept the property
  • PCI list from builder is incomplete and you need your own independent defect list
  • Multiple trades were involved in the build and you want one independent, consolidated list rather than the builder's own walkthrough
  • Had earlier stage inspections during construction and want the PCI to complete the record before handover

How your new build practical completion inspection runs

  1. Book before your handover date Book the PCI 1–2 weeks before your scheduled handover. Your builder will advise you of the practical completion date, book as soon as that date is confirmed. The inspection must occur while you can still reject defects under the building contract.
  2. Inspector assesses all fixtures, fittings and finishes Your SURE inspector systematically works through every room and all external areas, testing appliances, checking finishes, and assessing all items listed in the scope per AS 4349.0.
  3. Same-day report delivered A comprehensive defect report with photos, location references, and a prioritised list of outstanding items is delivered the same day.
  4. Use the report at handover Your report gives you documented grounds to require rectification before settlement. SURE inspectors can answer questions during the 12-month free advice period.
How it works

Book today.
Report promptly.

Get your estimate or call

Choose your inspection type, enter your address, and pick a time. Or call +61 468 044 653 and we'll handle it. We aim to confirm same business day.

2 minutes

Inspector visits

Your local SURE inspector arrives on time, checks every accessible area, and photographs every defect. You'll get a call if we find anything urgent.

1–2 hours

Get your report

Full PDF delivered promptly after inspection, with same-day delivery subject to access and availability. Photos, defect descriptions, cost estimates, and recommendations. Then 12 months of report-related follow-up support during business hours.

Same day where available

FAQs — New Build Practical Completion Inspection in the Central Coast region

When should a Practical Completion Inspection occur?

When construction is complete and handover is planned. Your builder will usually signal when this is approaching so a time can be arranged — ideally 1–2 weeks before handover, while you can still reject defects under the building contract.

What is the difference between a PCI and a handover inspection?

The Practical Completion Inspection (PCI) identifies defects and outstanding items before you accept the property. The Handover Inspection (separate service) verifies that all PCI defects have been rectified. The PCI is the first step, the Handover Inspection is the follow-up.

Does the PCI cover structural defects?

No, the PCI scope per AS 4349.0 covers non-structural fixtures, fittings, and finishes. Structural elements were addressed at earlier construction stages. If structural concerns exist, a separate structural assessment can be arranged.

Is polarity testing included?

Yes, polarity testing to all power points is included as standard in the PCI. This tests each power point for defective wiring conditions between the plug and RCD.

Do I need to attend the inspection?

No, you don't need to be on site. Your inspector will call you afterwards to talk through the findings and answer any questions, and the full report follows by email. You're welcome to attend if you'd like to, but there's no need to.

What is practical completion?

Practical completion is the stage where the builder considers the home substantially complete and ready for handover. It starts the defect liability period, when the builder is obligated to fix any documented defects.

Why does the PCI matter?

Any defect not documented at practical completion becomes harder to claim once the property has been handed over. The builder's obligation is to fix defects that existed at handover, and if you didn't identify them, proving they existed becomes difficult. A professional inspection creates a timestamped, independent record that sits alongside any earlier stage inspections you had completed during construction.

Will I need this report again later?

Yes. Keep your PCI report on hand for the Handover Inspection, a separate service that verifies each listed item has actually been rectified before you make final payment.

What if a defect is missed at PCI stage?

It can usually still be claimed under your builder's statutory warranty, but a documented PCI list is stronger evidence and easier to enforce than a claim raised after the fact. Defects picked up at PCI stage are fixed by the builder at no cost to you; the same defects found after handover become a warranty claim, and once the warranty period closes, they become your financial responsibility.

How long is the builder's defect liability period after handover?

This varies by state and by your specific contract. In Western Australia it's typically 6 to 12 months after handover; in New South Wales it's typically 13 weeks. Your PCI report gives you a documented record from before handover, which strengthens any claim regardless of which period applies to your build.

Are appliances tested during the PCI?

Yes, kitchen appliances, air-conditioning and lighting are tested where power is connected and the appliances are accessible.

Does the PCI check for termites?

Termite treatment verification is included as standard, though a full timber pest inspection covering every accessible timber is a separate service if you want that broader scope.

What does a building inspection on the Central Coast include?

We check all accessible areas (roof space, subfloor, interior rooms and the exterior site) and note structural issues, moisture, and safety and maintenance items. For coastal and older homes we recommend a combined building and timber pest inspection.

Do you inspect older beach and waterfront homes?

Yes. Much of the stock around Woy Woy, Ettalong, Long Jetty and the lake edge is older fibro and timber. We assess how salt air, moisture and ground conditions have affected the building, and flag anything that needs a closer look.

Can you do staged inspections on a new Central Coast build?

Yes. Frame, lock-up and practical completion (PCI) inspections are common across the Warnervale and Hamlyn Terrace estates. We document defects at each stage so they can be rectified before handover.

When should I book a Central Coast building inspection?

As soon as you are serious about a property. For private treaty sales, review the report before the cooling-off period ends; for auctions, complete the inspection before auction day.

Anthony on site

Anthony Capasso checking the underside of exterior eaves
Eaves and exterior finishes
Anthony Capasso using a moisture meter above an internal doorway
Moisture checks
Anthony Capasso inspecting an internal corner at floor level
Interior finishes
Anthony Capasso inspecting timber framing inside a roof space
Accessible roof spaces
Anthony Capasso using a thermal camera inside a roof space
Thermal imaging
Anthony Capasso examining exposed external pipework
Visible external plumbing

Built to last. Inspected to be SURE.

One inspection, twelve months of advice, and the same person on the other end of the phone every time you call. That is the part you do not see on the brochure.

Same-day reports (subject to access and availability) 12 months free advice Your inspector reads every report
Start my quote
Or call +61 468 044 653 business hours support

9,237 inspections · 242,618 defects found · Inspector-owned franchises